Brixton Water Tower · Johannesburg

Portfolio

Projects & outcomes

Johannesburg Water · Johannesburg

Brixton Reservoir Complex

R300 million Johannesburg Water infrastructure investment

Brixton story

The new Brixton complex officially opened in April 2026, adding a 26-megalitre reservoir, a two-megalitre tower and an automated pump station rated at 200 litres per second. The additional storage and pumping capacity are designed to help stabilise supply across the Commando system, which serves homes, hospitals and universities.

My contribution

As part of the project team, installed and commissioned the Schneider PLC and HMI at Brixton, integrated telemetry and pump protections, and coordinated backup generator operation with pump demand. At nearby Crosby, implemented duty and standby sequencing, alarms and protection logic for pumps supplying Brixton Reservoir.

Brixton Water Tower surrounded by scaffolding during construction
During construction
Completed blue Brixton Water Tower across the paved forecourt
Completed water tower

Mangaung · Bloemfontein

Maselspoort Water Treatment Works

R106.897 million Refurbishment project value supplied for this portfolio

Maselspoort story

The refurbishment covers filtration, clarification and wash-water recovery to support reliable treatment operations.

My contribution

Supported PLC and HMI automation for ten filtration units and four clarifiers. Implemented and tested backwash and clarifier sequences, verified field instrumentation and supported commissioning and operator training.

Mangaung Municipality · Refurbishment scope

Mining, manufacturing & logistics

Industrial automation

Production & repair

CHEP · Eastport & Polokwane

Commissioning details

Commissioned Allen-Bradley CompactLogix 5380 controls for pallet repair, washing, drying and stacking at Eastport, and upgraded pallet-production controls at Polokwane.

Machine safety

CHEP · South Africa & Namibia

Commissioning details

At Windhoek, integrated conveyor controls, safety gates, emergency stops and pull ropes, then supported testing and training. At Nelspruit, programmed and commissioned four control panels and integrated four interlocked gates. At Samrand and Bloemfontein, commissioned safety systems with scanners, radar and light curtains. Also configured and tested Allen-Bradley and Pilz controls for CHEP’s PNP Distribution work.

Mining & minerals processing

Brits & Multotec

Commissioning details

Installed and commissioned Siemens PLC automation for a new mining granulation plant in Brits. At Multotec, wired, installed and commissioned three control panels and tested and troubleshot Siemens S7-1200 and Ignition SCADA systems.

Pump-control modernisation

Matla, Duvha & Rietfontein

Commissioning details

Commissioned CompactLogix controls to replace legacy Siemens panels on the Matla and Duvha work, bringing two pumps under automated control with protective interlocks and SCADA. At Rietfontein, commissioned upgraded controls and operating protections for four pumps.

TCTA · Regional water infrastructure context

Municipal water distribution

From Pump to Tower

How gravity feed and automated refills work

Pump to storage

Pumps lift water into the elevated tank. The tank stores water so the pumps can refill it in cycles as demand changes throughout the day.

Gravity to the network

The height difference between the water surface and the points of use creates pressure. When water is drawn downstream, gravity drives flow through the distribution pipes, including while the fill pumps are idle. Available pressure depends on elevation and losses along the pipework.

Automated refill

Tank-level readings tell the PLC when to call for a refill and when to stop. Duty rotation shares run time, and permissives and protective interlocks govern whether a pump can run. At Heuwelsig, two PLCs exchanged signals over a 1.5 km industrial radio link. At Crosby, reservoir level drove pump demand, with automatic duty/standby changeover and operator alarms.

Bloemfontein

Heuwelsig Water Tower

Commissioning details

Commissioned level-based pump control over a 1.5 km industrial radio link, including alternating duty and protection logic for two pumps.

Mangaung’s 2018/19 draft development plan lists R10 million, R15 million and R5 million across three budget years for the tower. Those figures refer to historical tower planning.

Mangaung Municipality · Draft development plan, page 108

Randfontein

Randfontein Water Tower

Commissioning details

Refurbished and commissioned the distribution controls at Randfontein Rugby Club, configuring three pumps to rotate duty with protective interlocks.

Omega Shuro wearing a checked suit jacket in a garden

Journey

From software
to the field.

Career timeline
2019–2023
From a Raspberry Pi hackathon to software engineering at WeThinkCode and a development internship at SPACCE.
2020–2024
Built technology solutions for South African socio-economic challenges through the Empire Partner Foundation’s youth entrepreneurship competition.
Since 2024
Fieldwork has taken me across South Africa, from Johannesburg to Bloemfontein and Polokwane, and to Windhoek, Namibia.